• Home
  • Our projects
    • Roe Developments
    • Dukeries Homes
    • Anvil Developments
    • Southern Shopfitting
    • Overton Electrical
  • Our Services
    • Operated Plant projects
    • Roads and Surfacing
    • Ground Works
    • Drains and Sewers
    • Pumped Sewers
    • Suds
  • About Us
    • Meet the team
  • Photo Gallery
  • More
    • Home
    • Our projects
      • Roe Developments
      • Dukeries Homes
      • Anvil Developments
      • Southern Shopfitting
      • Overton Electrical
    • Our Services
      • Operated Plant projects
      • Roads and Surfacing
      • Ground Works
      • Drains and Sewers
      • Pumped Sewers
      • Suds
    • About Us
      • Meet the team
    • Photo Gallery
  • Home
  • Our projects
    • Roe Developments
    • Dukeries Homes
    • Anvil Developments
    • Southern Shopfitting
    • Overton Electrical
  • Our Services
    • Operated Plant projects
    • Roads and Surfacing
    • Ground Works
    • Drains and Sewers
    • Pumped Sewers
    • Suds
  • About Us
    • Meet the team
  • Photo Gallery
R4 Civils Ltd

Welcome to R4 Civils Ltd, civil engineering contractors

Welcome to R4 Civils Ltd, civil engineering contractorsWelcome to R4 Civils Ltd, civil engineering contractorsWelcome to R4 Civils Ltd, civil engineering contractorsWelcome to R4 Civils Ltd, civil engineering contractors

Dukeries Homes Housing Development

Section 278 works

Section 278 works

Section 278 works

Section 278 agreement - works to existing highways Section 278 of the Highways Act 1980 allows a developer to carry out works to the public highway . This is generally necessary where planning permission has been granted for a development that requires improvements to, or changes to, public highways .

section 108 works

Section 278 works

Section 278 works

B

section s38 works

Section 278 works

section 228 works

 Section 38 agreement - adoption of highways Section 38 of the Highways Act 1980 provides that when planning consent has been granted for a new development , developers may ask the highway authority to ‘adopt’ new roads that have been constructed as part of the development , along with associated infrastructure such as drains

section 228 works

section 228 works

R

Attenuation Crates

E

Soakaway Chambers

z

services

Roads

Sewers

Domestic Drainage

Domestic Drainage

R

Substation Base

Domestic Drainage

Substation Base

m

Private Drives

Domestic Drainage

Substation Base

C

Shared drives

Cut & Fill

m

Strip Foundations

Ground Bearing Floors

Steel Suspended Floor Slab

m

Steel Suspended Floor Slab

Steel Suspended Floor Slab

Steel Suspended Floor Slab

Trad’ Block & Beam Slab’s

Steel Suspended Floor Slab

Steel Suspended Floor Slab

Insulated Block and Beam

I

Earth Works

H

Topsoil Grading

Economic digging solutions

A

Economic digging solutions

Power Float Concrete Finishes

Economic digging solutions

Separation of materials

Power Float Concrete Finishes

Power Float Concrete Finishes

h

Power Float Concrete Finishes

Power Float Concrete Finishes

Power Float Concrete Finishes

C


Copyright © 2025 R4 Civils Ltd - All Rights Reserved.

Powered by

  • Privacy Policy